Rig Engineering
Rig Engineering service provided by Ocean Genesis consists of:
Leg Penetration Analysis (LPA) and Site-Specific Assessment (SSA) are required to be performed for a jack-up as part of location approval before it can go to a specific location. It presents the suitability of a particular jack-up to perform planned operations at a specific site. LPA and SSA are performed in accordance with the ISO-19905-1:2016.
Punch-through is a sudden and uncontrolled penetration of the spudcan often causing structural damage of the unit. It may occur when the load becomes equal to bearing capacity for the spudcan while within a soil layer having relatively higher bearing capacity than the soil underlying that layer.
Rig Upgrade Engineering
Rig Upgrade Engineering tailored to client specifications, meeting class and statutory requirements.
- Modification like Cantilever Extension, Leg length Increase Studies, Hull Refurbishment sequence, Additional Accommodation, Spudcan Design Engineering
- MODU to MOPU Conversion
- Life Extension Study
- Updating Marine operations Manual (MOM)
- Foundation Structural analysis- Vibration Analysis
- Dry docking Engineering
- Shipyard Support